Going with the Flow: Engineering Efficient Water Systems

In most municipalities, long before someone fills their coffee maker, water glass, or tub, a team of engineers has spent considerable time figuring out the best possible way to get them the water they’ll need safely, reliably, and cost-effectively. From the water towers visible in most communities to complex pump and tank systems, municipal water systems require an extensive period of research, planning, and problem-solving before they can be built and implemented. Engineering teams, for example, have to make sure that the system will have enough capacity to meet current, and future, demand.

New Distribution Center Acquired By Hallmark Floors

Hallmark Floors acquired a 170,476 SF distribution center from Vigavi on June 9th. The distribution center is located west of the Gulf Freeway near the Sam Houston Tollway at 730 Genoa Red Bluff Road. WGA served as the civil engineer on this project.